BACK TO HOMEPAGE >
Honorable Mention: International Architecture Awards 2022
Lanzhou WALL | Lanzhou, China | 2018
Architects: Beijing Guoke TianChuang Architectural Design Institute Co., Ltd.
General Contractor: The First Construction Engineering Company Ltd. of China Construction Second Engineering Bureau
Client: Wanda Cultual Tourism Planning & Research Institute Co., Ltd.
Photographs Courtesy of the Architects
Total construction scale of the project: About 320000㎡; It is composed of five formats, including commercial plaza, Ocean theme Park, ice-snow world, water park and sports park. The project is planned to start in 2020 and be completed and put into use in 2022. Including:
1.The total construction area of commercial plaza: 190200 ㎡ (above ground: 109600 ㎡; Underground: 80600㎡);
2.The total construction area of Ocean theme Park: 44200 ㎡ (above ground: 36200 ㎡; Underground: 5200 ㎡; Pipe gallery: 2800 ㎡);
3. The total construction area of the ice-snow park: 22800 ㎡ (above ground: 22100 ㎡; Underground: 700 ㎡);
4. The total construction area of the water park: 47300 ㎡ (above ground: 40800 ㎡; Underground: 5000 ㎡; Pipe gallery: 1500 ㎡);
5. The total construction area of the sports park: 15000 ㎡ (above ground: 14200 ㎡; Underground: 800 ㎡);